Pimpri Chinchwad Municipal Corporation · Pimpri Chinchwad, Maharashtra · 100 MLD · WTP
A 100 MLD water treatment plant serving the Pimpri Chinchwad municipal supply network, designed for conventional treatment with PLC/SCADA operations.
Read case study

Steel Authority of India Limited, Bhilai Steel Plant · Bhilai, Chhattisgarh · 30 MLD · WTP
A 30 MLD tertiary treatment plant polishing secondary effluent for industrial reuse at SAIL’s Bhilai Steel Plant, cutting freshwater drawdown for the works.
Read case study
Full project record
Beyond the case studies above, a record of 4 water and wastewater projects delivered over the last ten years, by category.
Capacity
100 MLD WTP
Designed a 300 MLD plant, commissioned its 100 MLD first phase, and ran ten years of O&M.
Pimpri Chinchwad Municipal Corporation · Pimpri, Pune, Maharashtra
Capacity
66 MLD and 6 MLD WTP
Built water treatment plants at SAF Lines and Purena for Bhilai, with five-year O&M.
Municipal Corporation, Bhilai · Bhilai, Chhattisgarh
Capacity
42.67 MLD WTP, pure water gravity main, distribution network
New Gadag-Betageri water supply: WTP, gravity main, and distribution with three-year O&M.
NKUSIP Cell, Gadag-Betageri · Gadag, Karnataka
Capacity
50 MLD WTP, 2 ML capacity Mass Balancing reservoir with 18 m staging, Pure water sump of 4.2 ML capacity
Conventional WTP with a mass-balancing reservoir, built for the 2015 Nashik Kumbh Mela.
Nashik Municipal Corporation · Nashik, Maharashtra