Projects
Filter by capability to find analogous work.

Municipal Corporation of Greater Mumbai · Mumbai, Maharashtra · 33.5 MLD · STP
Rejuvenation and beautification of the Poisar River through ten decentralised STPs with a combined 33.5 MLD MBR-based capacity, plus a 8.7 km sewerage collection network.
Read case study

Nashik Municipal Corporation · Nashik, Maharashtra · 52 MLD · STP
A 52 MLD sewage treatment plant on the banks of the Godavari, serving the Tapovan catchment of Nashik with low-power, compact-footprint treatment.
Read case study

Punjab Water Supply and Sewerage Board · Jalandhar, Punjab · 10 MLD · STP
A 10 MLD sewage treatment plant in the Jalandhar urban catchment, part of the city’s expanding wastewater treatment footprint.
Read case study

Punjab Water Supply & Sewerage Board · Jalandhar, Punjab · 50 MLD · STP
A 50 MLD sewage treatment plant serving the Jalandhar urban catchment, built under a state water-infrastructure programme.
Read case study
Full project record
Beyond the case studies above, a record of 11 water and wastewater projects delivered over the last ten years, by category.
Capacity
4 MLD, 3.5 MLD, 3 MLD and 2 MLD STP on MBR Technology along with sewer network, Road side drain, Interceptor and service road
Rejuvenated Mumbai's Poisar River with decentralised MBR sewage plants and 15-year O&M.
Municipal Corporation of Greater Mumbai (MCGM) · Mumbai, Maharashtra
Capacity
50 MLD STP based on Sequential Batch Reactor (SBR) Technology
Turnkey SBR sewage treatment plant for Jalandhar with five-year O&M.
Punjab Water Supply & Sewerage Board · Jalandhar, Punjab
Capacity
30 MLD STP based on Sequential Batch Reactor (SBR) Technology with Sewage Pumping Station of capacity 180 MLD
SBR sewage plant at Baner, Pune, with a 180 MLD pumping station and five-year O&M.
Pune Municipal Corporation · Pune, Maharashtra
Capacity
20 MLD STP based on Sequential Batch Reactor (SBR) Technology with Sewage Pumping Station of capacity 33.60 MLD
High-tech SBR sewage plant for Navi Mumbai's Karanjade sector with five-year O&M.
CIDCO · Karanjade, Navi Mumbai, Maharashtra
Capacity
20 MLD STP based on Sequential Batch Reactor (SBR) Technology with Sewage Pumping Station of capacity 20 MLD
SBR sewage treatment plant at Madihal, Dharwad, with operation and maintenance.
Hubballi-Dharwad Municipal Corporation (HDMC) · Hubbali, Karnataka
Capacity
18 MLD STP based on Sequential Batch Reactor (SBR) Technology with Sewage Pumping Station of capacity 4.5 and 25 MLD and Rising main of 500 mm dia
AMRUT sewage plant and two pumping stations at Gangapur, Nashik, with five-year O&M.
Nashik Municipal Corporation · Nashik, Maharashtra
Capacity
16 MLD STP based on Sequential Batch Reactor (SBR) Technology
SBR sewage treatment plant at Jagraon, Ludhiana, with five-year O&M.
Punjab Water Supply & Sewerage Board · Ludhiana, Punjab
Capacity
12 MLD STP based on Sequential Batch Reactor (SBR) Technology
Second SBR sewage treatment plant at Jagraon, Ludhiana, with five-year O&M.
Punjab Water Supply & Sewerage Board · Ludhiana, Punjab
Capacity
52 MLD STP on UASB Process follwed by Extended Aeration
Turnkey UASB and extended-aeration sewage plant at Tapovan, Nashik.
Nashik Municipal Corporation · Nashik, Maharashtra
Capacity
21 MLD STP based on Activated Sludge Process
Activated-sludge sewage plant at Panchak, Nashik, under JNNURM with five-year O&M.
Nashik Municipal Corporation · Nashik, Maharashtra
Capacity
20 MLD STP based on Activated Sludge Process
Activated-sludge sewage plant at Chehadi, Nashik, under JNNURM with five-year O&M.
Nashik Municipal Corporation · Nashik, Maharashtra